Starefoss ledning Ongoing

CTD and water samples along the pipeline route.

Location
Bergen, Vestland
Period
Mar 2025 to Mar 2027
Contact
Henrik Aasen
Vessels
Frigg, Odin
Methods
CTD Water samples Visual range
Progress
17 of 20 missions done
# Status
13 25 Jun 2026 Delivered
14 20 Jul 2026 Delivered
15 15 Aug 2026 Delivered
16 22 Sep 2026 Processing
17 17 Oct 2026 Delivered
18 18 Nov 2026 Scheduled

Waypoints

12 All waypoints
Waypoint Area Position Temp. (°C) Salinity O₂ (mg/l)
ST-01 Starefoss inner 60.398° N, 5.338° E 9.4 30.2 8.1
ST-02 Starefoss outfall 60.401° N, 5.331° E 10.1 30.8 8.6
ST-03 Pipeline km 0.5 60.404° N, 5.322° E 9.8 31.4 8.3
ST-04 Pipeline km 1.0 60.407° N, 5.313° E 9.5 30.2 8.8
ST-05 Pipeline km 1.5 60.411° N, 5.304° E 10.2 30.8 8.5

Values from the latest mission, at 1 m.