Overview Button Copy button Field Input Number field Textarea Select Combobox Multiselect Date picker Date range picker Date-time picker Checkbox Radio group Position picker Switch Slider Dropzone Device controls Avatar Badge Card Collapsible Kbd Map Matrix Proportion bar Separator Stat Table Timeline Chat Playback Pagination Charts Chart theming Profile chart Time series chart Bar chart Isopleth chart TS diagram Box plot Rose chart Calendar chart Banner Toast Loader Progress Skeleton Empty state Error state Dropdown menu Tooltip Info tooltip Dialog Sheet Resizable Confirm dialog Breadcrumbs Command palette Mobile menu Navigation list Outline Scroll rail Sidebar Tabs
Proportion bar
How a whole splits into parts, in one bar: samples by where they are, a fleet’s hours by what it was doing.
Delivery
A project’s samples by where they are, then each method under it in the same parts. On the project overview.
Delivery 68 % published
CTD 110/140Water samples 18/52Visual range 36/48
<ProportionBar
aria-label="Delivery"
parts={[
{ label: 'Published', value: 164, tone: 'success' },
{ label: 'At the lab', value: 22, tone: 'info' },
{ label: 'Skipped', value: 5, tone: 'warning' },
{ label: 'To come', value: 45, tone: 'faint' },
]}
/> A vessel’s week
Hours by state, in the status lanes’ colours: charging has its own, beside transit’s blue.
Otter Pro, the last 7 days 164 h
Rules
- For parts of one whole. Parts that don’t add up to something (three stations’ temperatures) are a bar chart.
- Instead of a donut. Lengths side by side compare at a glance, angles don’t, and bars stack into rows that compare too.
- Order the parts as the work goes, done first. What’s still to come goes last, faint.
- Five parts or so. More is a table.
- The headline goes above the bar, in words: "67 % published". The bar shows the rest.
- One keyed bar on top; the rows under it use the same parts in the same order, without keys.